철도이야기

Eurostar set to order non-French trains

By Robert Wright, Transport Correspondent

Published: October 1 2010 13:49 | Last updated: October 1 2010 19:54



Eurostar looks poised to defy French government opposition by becoming the first affiliate of SNCF, France’s state-owned train operator, to order non-French high-speed trains.

A board meeting on Friday afternoon of Eurostar, which is controlled by SNCF, decided to press on towards a final contract, likely to be worth more than $826m, for Velaro-D trains from Germany’s Siemens. Eurostar runs high-speed trains between the UK and mainland Europe.

Paris has been working hard in the past week to persuade the tunnel’s safety authorities to overturn a change in rules, people involved said. The change made it possible for the first time for the German-built trains to use the tunnel.

SNCF and its international joint ventures – which include Eurostar and Thalys, which runs from Paris to Brussels, Cologne and Amsterdam – previously ordered high-speed trains from Alstom, widely seen in France as a national champion. Alstom builds SNCF’s flagship 300kph TGV trains.

Eurostar selected the Velaro-D, the latest version of Germany’s ICE high-speed train family, over Alstom’s AGV, as its preferred option in June, but the deal became public only on Friday. The Velaro-D and AGV are now seen as Europe’s leading competitors for large high-speed train orders. SNCF has a record of buying trains built by non-French companies, including Canada’s Bombardier, but previous orders have been built at the contractors’ French factories.

Two of the parties involved told the Financial Times that French authorities were exerting pressure for a renewal of a recently-removed ban on the use of the tunnel by trains with “distributed traction”, where electrical equipment is hidden under the floor and the motors are distributed throughout the train.

Until earlier this year, the tunnel safety rules said all trains using it had to have electrical equipment and motors concentrated in power cars at either end, the arrangement on Euro-star’s existing trains, built in the early 1990s.

Both parties believed it reflected official frustration that Eurostar had opted for the German product. “What they are saying is that they will not endorse trains with distributed traction going through the tunnel,” one person familiar with Eurostar’s position said of the French authorities’ stance.

An international trainmaker confirmed the French authorities had been campaigning on the issue.

Nicolas Sarkozy, France’s president, has regularly expressed his pride in his pivotal role, when economy minister, in arranging a state-backed rescue for Alstom when it was in danger of collapse in 2004. When Alstom unveiled the AGV in 2008, Mr Sarkozy questioned the right of Alstom’s competitors to sell trains in France.

http://www.ft.com/cms/s/0/5696688c-cd4c-11df-ab20-00144feab49a.html

프랑스 정부의 반대를 치우고, 독일제의 동력 분산형 고속 열차 Velaro-D를, 차기 유로 스타에게 선택하려고 하고 있는 것 같습니다.
마지막 장벽이, 유러터널을 달리는 열차는, 기관차 방식이 아니면 안된다고 한 조항의 수정이라고.그러나, 그것도 아르스틈의 AGV도 같은 장해가 되어 있으므로, 그 조항은 폐지하지 않으면 안된다던가...

시대에 뒤떨어진 기관차 방식도, 벌써 마지막인가?^^


ユーロスターの新型はドイツ製

Eurostar set to order non-French trains

By Robert Wright, Transport Correspondent

Published: October 1 2010 13:49 | Last updated: October 1 2010 19:54



Eurostar looks poised to defy French government opposition by becoming the first affiliate of SNCF, France’s state-owned train operator, to order non-French high-speed trains.

A board meeting on Friday afternoon of Eurostar, which is controlled by SNCF, decided to press on towards a final contract, likely to be worth more than $826m, for Velaro-D trains from Germany’s Siemens. Eurostar runs high-speed trains between the UK and mainland Europe.

Paris has been working hard in the past week to persuade the tunnel’s safety authorities to overturn a change in rules, people involved said. The change made it possible for the first time for the German-built trains to use the tunnel.

SNCF and its international joint ventures – which include Eurostar and Thalys, which runs from Paris to Brussels, Cologne and Amsterdam – previously ordered high-speed trains from Alstom, widely seen in France as a national champion. Alstom builds SNCF’s flagship 300kph TGV trains.

Eurostar selected the Velaro-D, the latest version of Germany’s ICE high-speed train family, over Alstom’s AGV, as its preferred option in June, but the deal became public only on Friday. The Velaro-D and AGV are now seen as Europe’s leading competitors for large high-speed train orders. SNCF has a record of buying trains built by non-French companies, including Canada’s Bombardier, but previous orders have been built at the contractors’ French factories.

Two of the parties involved told the Financial Times that French authorities were exerting pressure for a renewal of a recently-removed ban on the use of the tunnel by trains with “distributed traction”, where electrical equipment is hidden under the floor and the motors are distributed throughout the train.

Until earlier this year, the tunnel safety rules said all trains using it had to have electrical equipment and motors concentrated in power cars at either end, the arrangement on Euro-star’s existing trains, built in the early 1990s.

Both parties believed it reflected official frustration that Eurostar had opted for the German product. “What they are saying is that they will not endorse trains with distributed traction going through the tunnel,” one person familiar with Eurostar’s position said of the French authorities’ stance.

An international trainmaker confirmed the French authorities had been campaigning on the issue.

Nicolas Sarkozy, France’s president, has regularly expressed his pride in his pivotal role, when economy minister, in arranging a state-backed rescue for Alstom when it was in danger of collapse in 2004. When Alstom unveiled the AGV in 2008, Mr Sarkozy questioned the right of Alstom’s competitors to sell trains in France.

http://www.ft.com/cms/s/0/5696688c-cd4c-11df-ab20-00144feab49a.html

フランス政府の反対を退けて、ドイツ製の動力分散型高速列車Velaro-Dを、次期ユーロスターに選択しようとしているようです。
最後の障壁が、ユーロトンネルを走る列車は、機関車方式でなければならないとした条項の修正だとか。しかし、それもアルストムのAGVも同様の障害になっているので、その条項は廃止しないと駄目だとか。。。

時代遅れの機関車方式も、もう終わりか?^^



TOTAL: 5156

번호 제목 글쓴이 날짜 조회 추천
1396
No Image
1조 2 천억엔의 용도 kore_a_4 2010-10-14 2544 0
1395
No Image
나리타 공항 개혁에! oios2 2010-10-14 2212 0
1394
No Image
중앙 리니어, 코스 결정에 oozinn 2010-10-13 2778 0
1393
No Image
10월 10 일본석유 코일 おけい 2010-10-11 2684 0
1392
No Image
한국의 신교통 시스템. umiboze 2010-10-11 3336 0
1391
No Image
샹하이의 지하철로의 광경 umiboze 2010-10-10 3333 0
1390
No Image
인천국제공항 팝니다! oios2 2010-10-09 2745 0
1389
No Image
(PAKURI) 퀴즈 여기는 어디?그 24 kore_a_4 2010-10-09 2005 0
1388
No Image
JR서일본, 특급 재편 kore_a_4 2010-10-08 3120 0
1387
No Image
토큐·메트로·동경도 경영, 3사국 상....... ねふ子 2010-10-08 1865 0
1386
No Image
신형 Eurostar e320 kore_a_4 2010-10-07 3454 0
1385
No Image
고속 철도 건설 계획! oios2 2010-10-05 2941 0
1384
No Image
스룩과 KANSAI Pink7180_ET会長 2010-10-04 3333 0
1383
No Image
얼마라면 삽니까? おけい 2010-10-04 2935 0
1382
No Image
유로 스타의 신형은 독일제 kore_a_4 2010-10-04 4415 0
1381
No Image
역명을 알 수 있으면 yambf sam 2010-10-04 1797 0
1380
No Image
입국관리국 75회 속인다! oios2 2010-10-03 2200 0
1379
No Image
슈와르트넷가 지사, 「대량학살 책임 ....... Gothamap 2010-10-03 6802 0
1378
No Image
세계의 공중촬영으로부터 예외편 The T....... Gothamap 2010-10-02 1884 0
1377
No Image
특징적인 「신쇼역」 おけい 2010-10-02 2635 0