철도이야기

Hitachi Class 800 trainsets begin testing in Japan
12 Sep 2014


Three Class 800 trainsets are now undergoing testing at Hitachi"s Japanese factory in Kasado.

UK: The first of three pre-series Class 800 intercity trainsets ordered under the Department for Transport’s Intercity Express Programme has begun low-speed running trials on the test track at Hitachi’s Kasado factory in Japan.

The first of the three bi-mode sets is expected to arrive in Britain early next year for trials on the East Coast Main Line, although Hitachi is discussing the possibility of using the Old Dalby test track.

A set of full-size vehicle mock-ups at industrial premises near Warwick has now been seen by more than 2 000 ‘stakeholders’ as the final part of an iterative process to finalise the design details well before the trains enter commercial service. Put together by DCA Design International, the mock-ups consist of a cab segment and sections of two cars with the interiors fashioned to replicate all the different areas of the TSI-compliant interior.

The cab is based on that of the Class 395 supplied by Hitachi for Southeastern services on High Speed 1, with some changes made following consultation with staff. Provision has also been made for driver-only operation.

The catering area is located at the outer end of one end car behind the cab and equipment area. A separate entrance and vestibule behind the cab is provided for catering staff. Hitachi says four catering levels are possible, but the DfT specification only covers Levels 1 and 4. Level 1 is a full galley, Level 2 would be a mix of a shop and buffet, Level 3 would be a larger shop, and Level 4 is a trolley.

A distinctive feature of the bi-mode trains will be the difference in floor heights between cars with and without diesel engines; the higher floor of cars with underfloor engines requires a transition slope at the end of the car, which may surprise passengers expecting a level passage between cars. A nine-car set will have five coaches with underfloor engines supplied by MTU, and a five-car will have three. The Class 801 electric trainsets will also have one underfloor diesel powerpack to provide emergency power instead of relying on back-up batteries.

http://www.railwaygazette.com/news/single-view/view/hitachi-class-800-trainsets-begin-testing-in-japan.html

이것, 첫 실사일까?3 양편성의 시험 차량은 일본에서 만든다고 써 있는데


日立、クラス800車両の試験始める

Hitachi Class 800 trainsets begin testing in Japan
12 Sep 2014


Three Class 800 trainsets are now undergoing testing at Hitachi"s Japanese factory in Kasado.

UK: The first of three pre-series Class 800 intercity trainsets ordered under the Department for Transport’s Intercity Express Programme has begun low-speed running trials on the test track at Hitachi’s Kasado factory in Japan.

The first of the three bi-mode sets is expected to arrive in Britain early next year for trials on the East Coast Main Line, although Hitachi is discussing the possibility of using the Old Dalby test track.

A set of full-size vehicle mock-ups at industrial premises near Warwick has now been seen by more than 2 000 ‘stakeholders’ as the final part of an iterative process to finalise the design details well before the trains enter commercial service. Put together by DCA Design International, the mock-ups consist of a cab segment and sections of two cars with the interiors fashioned to replicate all the different areas of the TSI-compliant interior.

The cab is based on that of the Class 395 supplied by Hitachi for Southeastern services on High Speed 1, with some changes made following consultation with staff. Provision has also been made for driver-only operation.

The catering area is located at the outer end of one end car behind the cab and equipment area. A separate entrance and vestibule behind the cab is provided for catering staff. Hitachi says four catering levels are possible, but the DfT specification only covers Levels 1 and 4. Level 1 is a full galley, Level 2 would be a mix of a shop and buffet, Level 3 would be a larger shop, and Level 4 is a trolley.

A distinctive feature of the bi-mode trains will be the difference in floor heights between cars with and without diesel engines; the higher floor of cars with underfloor engines requires a transition slope at the end of the car, which may surprise passengers expecting a level passage between cars. A nine-car set will have five coaches with underfloor engines supplied by MTU, and a five-car will have three. The Class 801 electric trainsets will also have one underfloor diesel powerpack to provide emergency power instead of relying on back-up batteries.

http://www.railwaygazette.com/news/single-view/view/hitachi-class-800-trainsets-begin-testing-in-japan.html

これ、初の実写だろうか?3両編成の試験車両は日本で作るって書いてあるけど



TOTAL: 5157

번호 제목 글쓴이 날짜 조회 추천
3677
No Image
일본 최강의 사이쿄선은, 해외에서도 ....... umiboze. 2014-09-29 6585 0
3676
No Image
서울 메트로 2호선, 국제 입찰 될까? kore_a_4 2014-09-28 3944 0
3675
No Image
한국 도시 리니어, 일년 이상 개통 연....... kore_a_4 2014-09-28 3868 0
3674
No Image
신형 「227계」보도 공개. umiboze. 2014-09-28 4180 0
3673
No Image
하네다 공항의 한계 sandra12 2014-09-27 4868 0
3672
No Image
한국인의 자존심, 인천 공항의 지금을....... kore_a_4 2014-09-26 4741 0
3671
No Image
UPS KOREA,인천공항 물류 허브 확장 sandra12 2014-09-26 3373 0
3670
No Image
인천 공항은 동북아시아의 허브공항 sandra12 2014-09-26 2983 0
3669
No Image
서울, 스크린 도어 설치역에서 사상사....... kore_a_4 2014-09-26 3431 0
3668
No Image
2017년,인천공항 3단계 확장공사가 완....... sandra12 2014-09-25 6165 0
3667
No Image
JR큐슈 매각이익의 용도 kore_a_4 2014-09-25 2739 0
3666
No Image
도토의 철도 유적···라든가. umiboze. 2014-09-24 3980 0
3665
No Image
인천 공항은, 허브공항으로부터 탈락....... kore_a_4 2014-09-23 4246 0
3664
No Image
에사시선적탐방···라든가. umiboze. 2014-09-23 3301 0
3663
No Image
토쿄 모노레일 개업 50주년 ねふ子 2014-09-18 3349 0
3662
No Image
JR서일본 “궤간 변환 시험을 개시에!....... sun3000 2014-09-17 4501 0
3661
No Image
새로운 차량을 살 수 없습니다 w kore_a_4 2014-09-16 4521 0
3660
No Image
시속 600km "꿈의 고속열차"는 언제쯤 ....... uninaramanse 2014-09-15 3800 0
3659
No Image
Calfornia 고속 철도는, 일본에서 정해져....... kore_a_4 2014-09-14 6624 0
3658
No Image
히타치, 클래스 800 차량의 시험 시작....... kore_a_4 2014-09-14 24934 0